ROAD AND TRAFFIC INDEX
Lemery, Batangas
LEMERY, BATANGAS
SURVEYED PAVEMENT DISTRESS IN LOZADA STREET
Defect(s)/Deficiencies Estimated Quantity Unit of Measure Remarks Length Width Depth No. of Slab Latitude Longitude
Total: 72
Transverse Crack 3 l.m 3m 2cm .5 cm 4 13.8759656 120.9130343
20 13.8761826 120.9138597
Transverse Crack 3 l.m 3m 2cm .5 cm 22 13.8762421 120.913901
Minor wornout surface 27.9 sq. m 26 13.8762701 120.914085
Major wornout and popouts 27.9 sq. m 27 13.8763207 120.9140706
minor wornout surface and scaling 83.7 sq. m 31 13.8763463 120.9143024
minor wornout surface sq. m 34 13.8764268 120.9144466
Faulting 0.21 sq. m 6 m 3.5 cm 6 cm 46 13.8765835 120.0982186
transverse crack 3 l.m 3m 5cm 49 13.8766617 120.9149479
minor wornout surface 27.9 sq. m 56 13.8767658 120.9152808
Potholes 0.0064 sq. m 8 cm 8cm 0.3 cm 64 13.8769189 120.9154249
Inlet Cracks 42.453 sq. m 0.267 m 0.159 m 67 13.8769206 120.9154578
Major Wornout Surface 139.5 sq. m 72 13.8769504 120.9157612
Note:
1. The data is surveyed last February 22, 2022.
2. The unit of measure l.m denotes linear meter.
CONTACT US
GOVERNMENT DIRECTORY
Lemery Engineering Office,
Ilustre Ave., Lemery, Batangas
pmsgislemery@gmail.com